Extra electrical points are added for the computer, printers etc.The back of the garage before starting.

The front of the garage -
Starting the dry lining -

The insulation boards ready to go down on the floor -
Back of the main beam & drainpipes boxed in. The pink board is fireboard.
Windowsill in place & floor screeded.
Laying the floor - the floating floor has 25mm board over high tech insulation board.
The room is now skimmed over the plasterboard and the floor is ready for the underfloor heating to go in tomorrow. Amazing that all this has happened in just four days!
No comments:
Post a Comment